A perfectly proportioned blend of high quality Portland Cement, clean concrete sand, and dry, crushed aggregate.
USES
Use where the thickness of finished Concrete will be in excess of 2 inches. (see CONCRETE SAND MIX for finished Concrete less than 2 inches).
SUGGESTED USES
Sidewalks - Driveways - Fence Posts - Steps - Foundations - Patios - Walls - Curbs - Spillways - Ponds - Ramps
FEATURES AND TECHNICAL DATA
-
Pre-blended and ready to use - Just add water.
-
Exceeds ASTM C-387 specification for strength when mixed according to directions.
-
IN 66 LB (30 KG) BAGS: 56 PER SKID
COVERAGE
Each 66 lb bag will produce about ½ cu foot of finished Concrete. For construction tubes:
6" tube requires ½ bag per foot of height
8" tube requires 1 bag per foot of height
10" tube requires 11/4 bags per foot of height
12" tube requires 2 bags per foot of height
DIRECTIONS
Empty contents of bag into mixer or wheelbarrow. Add water to the material, mixing as you go. Required water is about 2 1/2 quarts per bag. Too much water reduces the overall strength. Once mixed, pour the Concrete into desired area and tamp with a rod to eliminate voids. On slabs, level with a horizontal strike board before finishing. Normal finishing tools (float or trowel) are all that are needed to finish. Allow Concrete to set at least 1 day. For heavy traffic, allow 3 days of curing.